01438 841300
PROJECTS

REVIT SURVEYS

UAVs Usage for Flat Roof Drainage Calculations

Autodesk has launched Revit 2022, which will deliver “more effective design to documentation workflows, improved interoperability for project teams across all stages of design, and a raft of design productivity enhancements”. The latest version of Revit follows more than 8,000 user votes on what would make the software better. In a blog post, Autodesk product….

Deconstructing Digital Cultural Heritage

Whether as 2D drawings or 3D point clouds, digital cultural heritage is becoming the norm in heritage documentation nowadays. However, raw digital data still requires manual labelling in order to add tangible information to the otherwise strictly geometric data. This article presents an algorithmic approach to systematically deconstructing and semantically…..

Autodesk Launches Revit 2022 In Response To User Feedback

Autodesk has launched Revit 2022, which will deliver “more effective design to documentation workflows, improved interoperability for project teams across all stages of design, and a raft of design productivity enhancements”. The latest version of Revit follows more than 8,000 user votes on what would make the software better. In a blog post, Autodesk product….

3D Revit Survey Model of St Pancras Hospital site

Terrain Surveys were commissioned by the local NHS trust to carry out a programme of measured surveys at the St Pancras Hospital site. A topographical survey, elevations and an underground service trace…

Kennington Park

Terrain Surveys were commissioned by the site’s owners to produce measured surveys including a topographical survey and 3D model information for daylight sunlight studies. Using 3D laser scanning, pointcloud data was captured of the buildings…

Chocolate Factory

The Chocolate Factory is located in Wood Green, north London. The building offers workspaces to rent in the form of offices, studios and workshop spaces. The building was originally the headquarters of Barrat & Co, one of Britain’s best…

House 3D Revit Survey

Norwood based architects and interior designers, Micasa, contacted us to provide a measured survey of a semi-detached house located in Woodford. To aid a proposed refurbishment of the property Terrain Surveys were commissioned…

Westmorland Shopping Centre

Westmorland Shopping Centre is located in the centre of Kendal in the Lake District. With proposals in place to modernize the shopping centre, which currently comprises of a number of units on two levels and Kendal’s indoor market…

Robert Clack School of Science

Robert Clack School of Science, one of the largest comprehensive school sites in the country is located in the London Borough of Barking & Dagenham. Measured surveys were required for a large expansion project which included building on a new site…

Merchant Taylor Prep School

Merchant Taylors’ Preparatory School is an independent day school located in Moor Park, Hertfordshire. Measured surveys were required for a redevelopment project which included a 3D Revit model of one of the school buildings. We were…

Former Royal London Hospital

As part of the £77m regeneration project, the London Borough of Tower Hamlets is converting the former Royal London Hospital in Whitechapel into their new town hall and administration complex. The conversion to the new Civic Centre…

Haberdashers Aske’s Boys School

The Haberdashers’ Aske’s Boys’ School is an independent day school located on a large site near Elstree in Hertfordshire. Measured surveys were required for a proposal to build 9000sqm of new teaching facilities…

Accreditations

Enter your keyword